rate analysis for 12mm plaster
Total ( A + B ) = Rs. 11-28 Rate analysis of plastering comprise of following:-, ● 1) quantity and cost calculation of cement and sand used for plastering. Rate… Thickness of coping at the ends shall be 40 mm and 80 mm at centre. To calculate the cement and sand for 100 m 2 plastering area in 1:6 ratio and 12 mm thickness. December 2, 2020; Uncategorized -Rate for 10.0 m3 = Rs. Dry volume of mortar = 1.33 × 0.0063 = 0.008379m3, so dry volume of cement mortar is equal to 0.008379m3. Then we calculate for required area. Adish 2k18. Consider thickness of plastering 12mm in case of internal plastering,20mm in case of external plastering and 6mm in case of ceiling plastering. For wall plaster generally ratio we use = 1: 6 (1 part of cement and 6 part of sand). Dry volume of mortar = 1.33 × 0.0126 = 0.01676m3, so dry volume of cement mortar is equal to 0.01676m3. Nov 03, 2014 Quantity of Cement and Sand Calculation in Mortar Quantity of cement mortar is required for rate analysis of brickwork and plaster or estimation of masonry work for a building or structure. 12mm Thick Rough Plaster With CM 1:6. Material Estimation 2. Amount of plaster mortar required for plastering 100 sq.ft. Here is the useful Plaster calculator to calculate cement and sand for plastering. Ans. The quantity of cement mortar required will be: 2 x 1.5 x (20/1000) = 0.06 m3 of mortar. -Add 1% of contractors profit = Rs. For example. mm plaster is done in the ratio of 1:3 of cement and sand, respectively. So if you are a civil engineering student this is the best platform where you can improve your knowledge. ADD COMMENT 0. written 2.3 years ago by Sayali Bagwe • 5.8k: 15mm Thick plastering. New rates of these items can be worked out easily by changing the rates of materials and labours based on current market rates. Item No. Bond The arrangement of the bricks in successive courses to tic the brick work together both longitudinally Adding Bulking of Sand & Wastage. Rate analysis for 12mm (1:6) thick plaster per sq meter. With a final coat of Thistle Multi-Finish or Thistle Plaster Finish it provides a smooth, inert, high quality surface to … Exceeding 12mm diameter (For viewing only) Not exceeding 12mm diameter (For viewing only) e. BRC. From the mortar mix ratio (as per IS standard), the required mortar ratio is 1:3 and thickness is 15mm. -- Rate analysis of main item of work 12mm thick cement plaster in cement mortar (1:4) for sample of 100.0 m 2 (A) Material required Sr. Analysis & Rates. The rates of these labors for 8 hours are also provided. Vertical DPC:For damp proof course, the ratio of cement and sand must be 1:3 where the thickness can go up to 20mm. For conversion of wet volume to dry volume we will multiply 1.33 into wet volume,so. n4 - 3 mm thick lime punning 1 lime : 1 fine sand. BRC A6 (For viewing only) BRC A7 (For viewing only) BRC A8 (For viewing only) BRC A9 (For viewing only) BRC A10 (For viewing only) BRC A12 (For viewing only) BRC B6 (For viewing only) BRC B7 (For viewing only) Others (For viewing only) The thickness of plaster is between = 12 mm to 15 mm. Cement consumption in plaster 1:5 for 1m2 area, hi guys in this post we know about how much cement is required for plastering of 1 metre square area & also know about cement consumption in 12mm & 20mm thick plaster 1:5 of 1m2, 10m2 & 100 m2 area of brick wall. Water consumption 5. Suppose 5% of wastage of cement mortar during plastering work,so 5% of 0.006 = 0.0003m3, then total wet volume of cement mortar = 0.006 + 0.0003 =0.0063m3. Numbers of bags of cement = 420.5/50 = 8.4 bags = 9 bags Approx. 1:1, 1:2, Subtotal material cost = cement cost + sand cost = 28 + 25 = INR 53. Dry volume of mortar = 1.33 × 0.021 = 0.02793m3, so dry volume of cement mortar is equal to 0.02793m3. thus volume of plaster = 100 x 0.012 =1.2 cum add 60 % for uneveness of plaster surface and voids total volume of plaster work = 1.2 + 60/100 x 1.2 =1.92 cum volume of cement = 1.92 / (1+6)=0.274 cum no. In terms of a per square metre rate, expect: hard plaster rates to range from $20 to $70 per square metre; wet plaster rates to be range from $45 to $90 per square metre; You can expect to be quoted a flat fee for a room or house - a figure which does not include removal of existing plaster and does not take into account difficult access. -- Rate analysis of main item of work 12mm thick cement plaster in cement mortar (1:4) for sample of 100.0 m 2 (A) Material required Sr. Type of material. Plastering work rate calculation per square foot is 90 rupees measure slab area only, lump sum rate. Amount of plaster mortar required for plastering 100 sq.ft. It is useful for Consultants, Contractors, Architects and Builders for preparing the Rate Analysis of items like Concrete, Brickwork, Plaster etc. Ans. Quantity of sand = 6/7 ×0.02793 ×35.3147 = 0.845 cft, if market rate of sand is INR 50 per cft, then cost of 0.845 cft sand = 0.845 ×50 = INR 42. Hence in this way we can do Rate analysis for plastering easily. Quantity of sand = 6/7 ×0.01676 ×35.3147 = 0.507 cft, if market rate of sand is INR 50 per cft, then cost of 0.507 cft sand = 0.507 ×50 = INR 25. Plaster to be carried out in two layers of 10mm each. Volume of cement = 1.72/(1+5) x 1 = 0.29 meter cube, Converting it into weight = Volume x Density = 0.29 x 1450 = 420.5 kg [Density of cement is 1440 kg/meter cube.]. Step-3 Calculate volume of Cement and Sand, Now, let us do Rate analysis for plastering – Table, Self Curing Concrete – Preparation, Application, advantage, disadvantage, Cause, Effect, and Types of Segregation of concrete, Steel Vs Concrete – Advantages and Disadvantages With features, How to calculate bricks in a wall pdf – With Brick Masonry Pier, Brick masonry – Types, Tools, materials required and Procedure, IS codes for civil engineering free download pdf – All Codes Used, Cinder block vs Concrete block – Application, Uses, Cost-efficient, etc, Rain Water Harvesting Methods – Importance, Disadvantages, Design of circular water tank – Resting on the Ground, Under the Ground, AAC blocks vs Red bricks – Composition, Application, Preparation, Plane Table Surveying- Principle, Types, Two-point Problem, What is PCC DPC and RCC in civil engineering | RCC and PCC, Size of steel bars used for Construction – Civil Concept, Minimum clear cover for slab, column, beam, Retaining Structure, Step by Step- RCC roof Slab steel calculation- Numerical Example, Uses of rain gauge | Rain gauge types | Tipping bucket rain gauge, Relation between Discharge velocity and Seepage velocity in soil mass, 2020 – Soil mechanics by bc punmia pdf free download [.PDF], Rate analysis for Concrete- Step by Step calculation with table. Ans. ( full rate analysis program + specs in sra ) n1 - 12 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. Total cost and rate of 6mm (1:4) thick plaster per sq meter is INR 188 or INR 18 per sq ft for ceiling. 2)White washing or colour washing (3 coats) – 1 white washer and 1 mazdoor can do 60sqm (600sqft) per day. Thus to do 100 sq.ft.plaster (12mm thick) with … Rate per sq m for 12mm (1:6) internal plaster include quantity of cement sand and water And Labour expenses, now do the following step calculation find out post and quantity of cement sand used in plastering. Volume of Sand = 1.72/(5+1) x 5 = 1.43 meter cube. Rate analysis for cement mortar requires estimation of materials for cement mortar, i.e. Unit weight of construction materials- How to calculate it? Table 13.1: Consumption of Cement in the Cement Plaster Thickness of Plaster Consumption of cement (Sack) 20 mm thick (1%4) single coat 0-18 per square metre 20 mm thick (1%5) single coat 0-14 per square metre ... 3 3 Coat Snowcem Cement Ext. This calculation calculates of cement, sand (Plaster = […] Fix the chicken mesh on joint of R.C.C. Cost of cement, sand, labour and tools depend on local availability and local rates. Download: Use this plaster calculator offline with our all-in-one calculator app for Android and iOS. BuildInfo.co.in provides up to date information about the construction industry to the Builders/Developers, industry professionals like architects, interior designers, consulting engineers, and also to the civil engineering / architecture students. So, to calculate the rate analysis of plaster we have to know the the quantity and rate of each materials. n3 - 18 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. Browning is an undercoat plaster for solid backgrounds of moderate suction with an adequate mechanical key.. Thistle Hardwall is a gypsum undercoat plaster for use on most masonry. Rough sides of walls: A 9mm or 4.5mm thick plastering is good for rough sides of walls and always keep the ratio 1:4. Backing coat – 10mm-12mm; Finishing coat – 3mm-8mm Amount of plaster mortar required for plastering 100 sq.ft. 11-26 Appendix-II Recommended Mix Proportions. 11.5 Cement and Cement Lime Plaster 11-4 11.6 Lime Plaster 11-14 11.7 15 mm Mud Plaster 11-17 11.8 Special Finishes 11-19 11.9 Pointing on Brick. ( full rate analysis program + specs in sra ) n1 - 12 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. Step-4: CalculateMaterials required for the plaster volume Generally taken 10 mm. STEP 1 – Mortar Mix Material Calculation. Rate… ◆You Can Follow me on Facebook and Subscribe our Youtube Channel, 1)what is concrete and its types and properties, 2) concrete quantity calculation for staircase and its formula, Your email address will not be published. So, one part of cement is mixed with 5 parts of sand. 1) cement consumption for plastering internal brick wall :- For a Sample calculation, I will assume a 12mm thick plaster and a mix ratio of 1:5 for plastering of 1m2 brick wall Step-1: we know given area of brick wall = 1m2 Step-2: Volume of internal wall plaster = Area X Thickness = 1 X 0.012 = 0.012 cu m For Roof plaster mainly ratio we use = 1: 4 (1 part of cement and 4 part of sand). Analysis of rates for labour and material ... 3 mazdoors and 1 bhisti per day for mixing laying and finishing. Labour Estimation 3. Cost of unit item = Material cost + Labor cost + Equipment cost. plaster volume calculator. 1) Plastering with any mortar 12mm (5”) thick – 3 masons, 3 mazdoors and 1 bhisti can plaster 40sqm (400a ft) per day. Assume 12mm thk internal plaster Assume 100 sq m of plaster area Dry Volume = 100 x 0.012 = 1.2 cu m Wet volume $= 30 \% \ \ extra \\ \; =1.3 {\times} 1.2 \\ =1.56 \ \ cu \ m$ PDF. PDF. Always use Good quality of cement (Different grades of cement) as well as good quality sand. Step-3: Calculate Plaster volume required. The quantities of materials cement sand and water are required and their cost should be known and the number of different categories of labours required and the capacity of doing work per labour and their wages per day should be known. Quantity of sand = 4/5 ×0.008379 ×35.3147 = 0.24 cft, if market rate of sand is INR 50 per cft, then cost of 0.24 cft sand = 0.24 ×50 = INR 12. Step-1 Write all given data Thickness of Plaster = 12 mm = 0.012 meter Mix ratio of plaster = 1:5 Mortar for Area for plaster = 1 Square meter.
Auto Parts Ecommerce Software, Diy Hanging Planter Box, Exercise For Seniors Over 75, How Many Aircraft Carrier Pakistan Have, Best Farming Spot Ragnarok Mobile,
Recent Comments